Sr. No. | Stages Of Inspection | Inspection By Third Party /Client's Representative |
I. | RAW MATERIAL : Identification and Check testing | Stamping on identified Raw Materials and samples andsending samples to Govt. approved lab |
II. | DIMENSIONAL & VISUAL CHECKING | At random or as desired by Third party inspector / by client's Representative |
III. | CHEMICAL ANALYSIS | Witnessing of Tests & Verification of Test Report |
IV. | PHYSICAL : Tensile Test Micro Test | Witnessing of Tests & Verification of Test Report |
V. | STAMP TRANSFERRING TO TEMPLATES | Only if the Tests confirms to order specifications |
VI. | SUBMISSION OF : WPS PQR | Approved by Third Party / Client Witness by Third party client |
VII. | WELDERS PERFORMANCE TEST | Verification of Approved Lab Test Certificates |
VIII. | FILLER WIRE / WELDING ROD | Chemical analysis to be carried out / M.T.C. to be verified |
IX. | D.P.TEST (a) 100 % Root Run (b) 100 % final weld | To be witnessed by Inspector |
X. | RADIOGRAPHIC EXAMINATION FOR 10 % WELD JOINTS OR AS DESIRED BY CUSTOMER / INSPECTOR | X - Ray films and Test Report to be verified |
XI. | Tensile Test on the Welded portion Micro Test on the weld effected area | To be witnessed and reports to be verified |
XII. | HEAT TREATMENT & SOLUTION ANNEALING | As desired by client / Third Party Inspection Agency |
XIII. | PICKLING AND PASSIVATION FOR S.S. | Report shall be submitted to Inspector |
XIV. | SHORT BLASTING, OILING /WARNISHING AND PAINTING FOR A.S. & C.S. | Visual Inspection |
XV. | MARKING | Etching / Punching of size, sch, specn. & heat No. |
XVI. | FINAL INSPECTION | Dimensional check & Visual inspection |
XVII. | ACCEPTANCE OF MATERIALS | Putting final Acceptance Identification Marks and issuing of Dispatch Clearance Certificate. |